ATM Maintenace Coverage

    

ATM Maintenance Coverage
First Line and After Hour Maintenance
Rockford Tech-Systems, Inc.’s First Line and After Hour Maintenance program includes the following services:
- Reloading of receipt printer paper as needed.
- Reloading of audit printer paper as needed.
- Removal and repair of receipt and audit paper jams.
- Removal of jammed cards from card reader.
- Clearing of dispenser and depository problems.
- Receipt of service calls directly from ATM network.
- Dispatching of appropriate repair personnel.

Contract hours for First Line and After Hour Maintenance are as follows:

First Line Maintenance
365 Days per Year
8:00 am – 11:00 pm

After Hour Maintenance
Monday – Friday
5:00 – 11:00 pm
Weekends and Holidays
8:00 am – 11:00 pm



Hard (Second) Line Maintenance
Rockford Tech-Systems, Inc.’s Hard (Second) Line Maintenance program includes the following services:

- One preventative maintenance inspection per year.

- All service calls included due to electronic and mechanical failure.

- Mechanical, electronic, and sub-assembly parts included.

- Re-inking ribbon for audit and receipt printers provided
and installed by Rockford Tech-Systems, Inc. at no charge to client.

- Depository ink cartridges provided and installed by Rockford Tech-Systems, Inc. at no charge to client.

- Failure of equipment due to vandalism, lightning, or
any other act of God will be repaired on a billed work basis as deemed necessary by Rockford Tech-Systems, Inc. to place equipment back into normal and safe operation.

- Client to provide receipt and audit paper, currency
separators, and currency in a condition and grade as recommended in owner’s manual and Rockford Tech-Systems, Inc. specifications.

Contract hours for Hard (Second) Line Maintenance are as follows:

Monday – Friday
8:00 am – 5:00 pm

Saturday
8:00 am – 12:00 pm